[1]
A. F. Setiawan, N. Dwivania, and M. L. Sunaris, “Analisis Keterlambatan Pengiriman Material Beton (Studi Kasus Proyek Breeze Tower, Bintaro PT. Tatamulia Nusantara Indah)”, jts, vol. 15, no. 1, pp. 26–35, Aug. 2019.