[1]
Setiawan, D. and Simatupang, R. 2019. Pengembangan Model Simulasi Integrasi Biaya dan Jadwal Proyek Konstuksi di Bawah Ketidakpastian. Jurnal Teknik Sipil. 6, 2 (Mar. 2019), 165–192. DOI:https://doi.org/10.28932/jts.v6i2.1334.