[1]
Girsang, H. and Chamami , I. 2024. Quality Control Production of Concrete Tunnel Segment Based on Six Sigma Method in the Mass Rapid Transit Project. Jurnal Teknik Sipil. 20, 1 (Apr. 2024), 43–62. DOI:https://doi.org/10.28932/jts.v20i1.6391.