TY - JOUR AU - Irawati, AU - Setyowati, Tri AU - Midiyanti, Rima PY - 2022/04/01 Y2 - 2024/03/28 TI - PERFORMANCE EVALUATION OF TRADITIONAL MARKET’S FACILITIES AND INFRASTRUCTURES: (CASE STUDY OF PASAR ANYAR IN BANDUNG CITY) JF - Jurnal Teknik Sipil JA - jts VL - 18 IS - 1 SE - Articles DO - 10.28932/jts.v18i1.3703 UR - https://journal.maranatha.edu/index.php/jts/article/view/3703 SP - 12-32 AB - <p>Pasar Anyar<em> is an A class </em><em>people’s</em><em> market managed by </em>PD. Pasar Bermartabat Bandung<em>. </em><em>The land of this market has an area of </em><em>10,190 m<sup>2</sup> and </em><em>the</em><em> building</em><em> has an</em><em> area of 9,350 m<sup>2</sup>. In 2017, the trading area for meat and vegetables</em><em> was constructed, i</em><em>n 2019 the roof was repaired</em><em>,</em> <em>and </em><em>in 2021 the management office was repaired. The building of </em>Pasar Anyar<em> has exceeded its economic age</em><em> and</em> <em>has </em><em>unorganized trading zones</em><em>. The</em><em> facilities and infrastructure</em><em>s are</em><em> dirty and damaged, </em><em>also</em><em> some infrastructure</em><em> has not available yet</em><em>. The purpose of this research is to find out the performance of </em>Pasar Anyar<em>’s facilities and infrastructure. </em><em>This</em><em> evaluation of </em>Pasar Anyar<em> uses performance indicators of facilities and infrastructure, namely accessibility, </em><em>f</em><em>acilities, convenient, and spacial and building layout. The research methods used are descriptive with qualitative and quantitative approaches, data analysis techniques with building</em><em> and</em><em> technical </em><em>statistical </em><em>requirements, and data collection techniques using observations, interviews, questionnaires, and documentation studies. The results showed that the facilities and infrastructure of </em>Pasar Anyar<em> are not in accordance with </em><em>people’s </em><em>market standards</em><em>. Therefore, redeveloping the damaged facilities and infrastructures is needed to be done. Additionally, build infrastructures that has yet to be available is required.</em></p> ER -