Quality Control Production of Concrete Tunnel Segment Based on Six Sigma Method in the Mass Rapid Transit Project

Authors

  • Hamonangan Girsang Departemen Teknik Sipil, Fakultas Teknik Universitas Mercu Buana, Jakarta Barat, 11650, Indonesia
  • Ichsan Chamami Departemen Quality Control, PT. Wijaya Karya Beton, Karawang, 41363, Indonesia

DOI:

https://doi.org/10.28932/jts.v20i1.6391

Keywords:

Concrete Tunnel Segment, Defect, Quality, MRT Project, Six Sigma

Abstract

Development infrastructure construction of MRT Jakarta Project Phase 2A with length is 5.8 kilometers consist of seven underground stations, production concrete tunnel segment done by XY company as the ability to meet the quality of Japanese Industrial Standard provides added value to the company. However during the production process concrete tunnel segment products often defects. This is in line with production report within 4 weeks which found defects. This study aims to determine the percentage of defects in the production of concrete tunnel segment and determine the factors causing occurrence of defects than improvements can be made to control production quality. The six sigma analysis method was used in this study by carrying out five stages of analysis are define, measure, analyze, improve, and control. This study result is average percentage of defects occurred is 5.80% with a total chipped defect of 54.21%, cracks 30%, chipped and cracks 15.26%, and rejects 0.53% with an average sigma level of 3.07. Factors are very decisive in controlling the production quality of the concrete tunnel segment are work methods, people management and tools, where are three factors a direct role during the production work process.

Downloads

Download data is not yet available.

References

Al-Saedi, Alaa. Paslawski, Jerzy, and Nowotarski, Piotr. (2019): Quality Management to Continuous Improvements in Process of Ready Mix Concrete Production, IOP Conf. Series: Materials Science and Engineering 518(1) : 1-15.

Bahrud, Saifudin. (2018): Analisa Pengendalian Mutu Produk Box Culvert dengan Menggunakan Metode Six Sigma, Jurnal Unessa 2(2) : 1-10.

Ervianto, W.I. (2005): Manajemen Proyek Konstruksi, Andi, Yogyakarta.

Gaspersz, Vincent. Fontana, Avanti. (2011): Lean Six Sigma for Manufacturing and Service Industries : Waste Elimination and Continuous Cost Reduction, Bogor : Vinchristo Publication.

Gaspersz, Vincent. (2001): Total Quality Management, Gramedia, Jakarta.

Gaspersz, Vincent. (2002): ISO: 2000 And Continual Quality Improvement, Gramedia, Jakarta.

Ivanda, Mitra Amerta and Suliantoro, Hery. (2018): Analisis Pengendalian Kualitas dengan Metode Six Sigma Pada proses Produksi Barcode PT. Bakti Putra Nusantara, Industrial Engineering Online Journal 7(1) : 1-7.

PMI. (2017). A Guide to The Project Management Body of Knowledge (PMBOK Guide) Sixth Edition. Pennyslvania: Project Management Institute, Inc.

Pratiwi, Reno. Mustakim. Sucilianti, Leni. (2021): Pengendalian Kualitas pada Corrugated Concrete Sheet Pile dengan Metode Six Sigma. Jurnal Transukma 3(2) : 99-113.

Soemohadiwidjojo, Arini.T. (2017): Six Sigma Metode Pengukuran Kinerja Perusahaan Berbasis Statistik, Raih Asa Sukses, Jakarta.

Simanjuntak, Manlian R.A. and Manik, Raja B.H. (2019): Kajian Awal Sistem Manajemen Pengendalian Mutu dalam Meningkatkan Kinerja Waktu Proses Konstruksi Bangunan Gedung Tinggi Hunian di DKI Jakarta, Prosiding Seminar Nasional Teknik Sipil IX(1) : 258-264.

S Indriyawati, Gde Agus Yudha Prawira Adistana (2018): Analisis Pengendalian Kualitas Produk Tiang Pancang Menggunakan Metode Six Sigma. Jurnal Rekayasa Teknik Sipil 2(2): https://ejournal.unesa.ac.id/index.php/rekayasa-teknik-sipil/issue/view/1420

Wartuny, William Ridson. Lumeno, Shirly. and Mandagi, R.J.M. (2018): Model Penerapan Sistem Manajemen Mutu Berbasis ISO 9001:2015 pada Kontraktor di Propinsi Papua Barat’, Jurnal Sipil Statik 6(8): 579-588.

Yunita, Heni. Soekiman, Anton. (2017): Analisis Tingkat Kepuasan Pengguna Jasa Konstruksi terhadap Penerapan Sistem Manajemen Mutu ISO 9001:2008 di Perusahaan Jasa Konstruksi, Jurnal Konstruksia 8(1): 35 – 46

Downloads

Published

2024-04-01

How to Cite

Girsang, H., & Chamami , I. (2024). Quality Control Production of Concrete Tunnel Segment Based on Six Sigma Method in the Mass Rapid Transit Project. Jurnal Teknik Sipil, 20(1), 43–62. https://doi.org/10.28932/jts.v20i1.6391