Productivity Comparison Analysis of Piling Tools Drop Hammer and Jack in Pile in Construction Project of SMAN 14 Samarinda

Authors

  • Adde Currie Siregar Universitas Muhammadiyah Kalimantan Timur
  • Santi Yatnikasari Universitas Muhammadiyah Kalimantan Timur
  • Fitriyati Agustina Universitas Muhammadiyah Kalimantan Timur
  • Vebrian Vebrian Universitas Muhammadiyah Kalimantan Timur
  • Muhammad Jalil Universitas Muhammadiyah Kalimantan Timur

DOI:

https://doi.org/10.28932/jts.v19i2.5344

Keywords:

Drop Hammer, Jack in Pile, Tool Productivity

Abstract

Along with the development of construction projects, many tools have been created and developed to assist and facilitate activities in construction projects. In carrying out the selection of tools, it is very necessary to plan properly and carefully according to the conditions of the project and the ability of the workers. One tool that is generally used in projects for tall buildings is the piling tool for working on the foundation. In the construction project of SMAN 14 Samarinda, the rigging tools are used, namely drop hammer and jack in pile. This study discusses productivity and several strategies to increase the duration of pile equipment. The data used is obtained from the project in the form of pile tool cycle time data. From the analysis it is known that the average productivity value of the jack in pile is 2.19 and the drop hammer is 1.20. From this productivity, the jack in pile is more efficient than the drop hammer. The use of a drop hammer was chosen because it is relatively inexpensive and the jack in pile was chosen because this method uses static pressure without causing negative impacts (noise and vibration) to the residents around the project. The piling tools used must prioritize the economic value aspects and without negative impact on the community.

Downloads

Download data is not yet available.

References

Bustamin, M. O., Yakin, K., & Andriansyah, F. F,. (2021). Analisis Waktu Dan Biaya Proyek Pemasangan Pondasi Tiang Pancang Dengan Menggunakan Metode Perancangan Jack In Pile Dan Drop Hammer (Studi Kasus: Proyek Relokasi Kantor Pier Dan Pembangunan Masjid Pier-Pier, Pasuruan). AGREGAT, 6(1).

Hakim, A. R., & Akbar, A,. (2017). Productivity Analysis Of Hydraulic Static Pile Driver On Victoria Square Tower B Apartment. International Journal of New Technology and Research, 3(10), 263223.

Handayani, E., & Maknun, J,. (2018). Efektifitas Penggunaan Alat Hydraulic Static Pile Driver (HSPD) pada Pemancangan. Jurnal Civronlit Unbari, 3(1), 1-8.

Puspita, D. A. (2016). Analisa Produktivitas Alat Berat Diesel Hammer Dan Hydraulic Hammer Pada Pemasangan Pondasi Tiang Pancang Di Proyek Pembangunan Gedung 2 SMK 1 Muhammadiyah Kepanjen Kabupaten Malang (Doctoral Dissertation, University of Muhammadiyah Malang).

Puspitasari, M., & Nursin, A,. (2021). Analisis Produktivitas Alat Pancang Hydraulic Static Pile Driver Untuk Meningkatkan Kinerja Waktu Pada Proyek Apartemen Apple 3 Condovilla. Construction AND Material Journal, 3(3), 207-217.

Pratama, M. I., & Bhaskara, A,. (2020). Komparasi Biaya dan Waktu Pekerjaan Tiang Pancang Metode Hydraulic Static Pile Driver Dengan Drop Hammer. Reviews in Civil Engineering, 4(2).

Permen PUPR No. 28,. (2016). Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum, Kementrian PUPR, Jakarta.

Utomo, G., & Al Qurina, E,. (2020). Analisis Produktivitas Tiang Pancang dengan Jack In Pile pada Konstruksi Workshop: Analysis of Pile Productivity With Jack In Pile For Workshop Construction. Jurnal Ilmiah Teknik Sipil TRANSUKMA, 3(1), 17-24.

Downloads

Published

2023-10-01

How to Cite

Siregar, A. C., Yatnikasari, S., Agustina, F. ., Vebrian, V., & Jalil , M. (2023). Productivity Comparison Analysis of Piling Tools Drop Hammer and Jack in Pile in Construction Project of SMAN 14 Samarinda. Jurnal Teknik Sipil, 19(2), 174–184. https://doi.org/10.28932/jts.v19i2.5344